PJS - This parking system is designed 2-3 layers up and down as one unit. All spaces in the upper and lower spaces are unified together and improved together. Usually, the bottom space is under the ground of the mine. The top space and the ground are on the same line for cars directly. The bottom space can be parked, when it is improved.